LEITC sets the standard for customer service.

LEITC believes your product should be in the market and not in the test lab. When your product arrives at LEITC, you are assigned a single point of contact for all your project coordination. Should deficiencies be discovered during the testing process, the project engineer will immediately notify you to discuss practical and cost effective solutions. By working with you, we can effectively reduce the overall time of the testing project.

EMC & Electrical testing in LEITC accredited lab:

• RF Radiated Emissions
• RF Radiated Immunity
• RF Conducted Emissions
• RF Conducted Immunity
• Conducted Transient Emissions
• Conducted Transient Immunity
• Coupled Transient Immunity (Direct Capacitor Coupling)
• Magnetic Field Emissions (MFE)
• Magnetic Field Immunity
• Electrostatic Discharge (ESD up to 15 KV)
• Electrical Overstress

EMC related services:
• Design early stage EMC analysis support
• Prototype precompliance
• Design & production compliance
• Proficiency testing and OEM test methods trends analysis support
• EMC & Electrical test plan development & review
• EMC compliant DUT exerciser HW/SW development
• Test report review and results mitigation

Pre-compliance testingThere are many cases where it is prudent to carry out preliminary EMC checks on a prototype during development to reduce emissions and strengthen immunity before final testing and design sign off. This is referred to as pre-compliance testing as it takes place prior to formal compliance testing and is part design and development rather than the approvals process per se. Pre-compliance testing is outside of the scope of our LATAK accreditation as it usually only involves a subset of the full series of required tests. This approach will generally save cost overall if the EMC characteristics of the product are not known as the risk of test results being out of limits during compliance testing is reduced.

Post-compliance testingSimilarly there is a place for post-compliance testing to ensure that a product remains compliant during its production life. If an EMC critical component, for example a fast switching power FET or a filter component, is changed, re-testing should be carried out. However, if there is doubt about whether a component is going to affect EMC a set of simple EMC measurements could be carried out to determine if a full test is required. Thus post-compliance testing can be either a full, LATAK accredited test or a non-accredited test as appropriate. 


Industries to serve

• Telecommunications
• Radio equipment
• IT and Audio/Video
• Light and LED
• Components Plugs and Sockets
• Medical
• Military
• Marine equipment
• Household Appliances

How to apply

To apply for any of our services or just need advice, send your contact information to and we will contact you and we will send you an application form. If you need more information, our telephone number is

mob. +371 2 2001023 


Take benefit from our EMC experiences and our comprehensive knowledge on electromagnetic compatibility! Our EMC competences are based on longterm involvement in the field as well as on latest EMC research. More info in Consulting section.

Request for a quote

If you need sales assistance, please visit contact section, and send us email or give a call. Upon receiving your email a representative from our office will be in contact with you shortly. 

Pre-compliance tests

We offer EMC pre-compliance tests for electronics product manufacturers and importers, to assure that products complies with EN and IEC directives before it is offered to the market. More in pre-compliance section.
leitc 360